IPD, SB1953 and Other Acronyms Driving the California Health Care Market

Just finished a wide-ranging interview with Bob Mitsch, vice president of facility planning and development for Sutter Health. Bob discussed his organization’s experiences with and commitment to integrated project delivery (IPD), the innovative contracting and project delivery method that Sutter is often credited with creating. He also spoke about the outlook for the health care sector as it pertains to the design and construction industry, as well as the attributes he looks for in an architecture, engineering or contracting firm.

Bob’s interview, along with much more on the health care market, AEC industry trends, and the outlook for the California design and construction market will be documented in The 2011-2012 AEC Market Guide to California.

Leave a Reply